Home MenuNursery Field Improvement Project
In a June 14, 2023 resolution, the Rye City Council directed City staff to engage consultants to prepare drawings and relevant studies for the environmental and regulatory review for the proposed construction of a synthetic turf field to replace the existing grass athletic field at Rye Nursery located at 421 Milton Avenue. More specifically, the City Council resolution stated that the proposed action should be a “…synthetic turf field with a playing surface elevated above the 100-year FEMA flood elevation, including a robust sub-surface drainage system and an appropriate field base and infill material (other than crumb rubber) that is sensitive to the health and safety of field users and that does not significantly adversely affect impact the environmental functions of adjacent wetlands.”
The City Council further directed that the proposed action be referred to the Rye City Planning Commission for its advisory opinion of the potential wetland impacts and the consistency of the proposed action with the Local Waterfront Revitalization Program (LWRP). In late September 2023 all documents and information requested by the City Council were posted on the City website (see below). A printed version of this submission is also available for public review in the City Clerks Office of Rye City Hall and the Rye Free Reading Room.
The Planning Commission reviewed and discussed the project at public work sessions on October 10, October 24, November 14 and November 21, 2023 and considered public comment submitted via email. The Planning Commission provided the City Council with its advisory comments in a November 21, 2023 memorandum. On December 6, 2023 the City Council adopted a resolution finding that the proposed project would not have a significant adverse impact on the environment (i.e. SEQRA Negative Declaration) and that the project is consistent with the polices policies of the City's Local Waterfront Revitalization Program (i.e. coastal consistency determination).
Relevant documents, plans and City Council meeting videos related to this project dating back to 2020 are provided below. Comments and questions can be sent via email to nurseryfield@ryeny.gov.
Nursery Field Turf Bid Document Information:
- City Staff Bid Results Memo to City Council 2024 10 15
- GZA Nursery Field Soil Analysis and Testing Results
- Tenen Environmental Review of Nursery Field Soil Test Results
- Infill Test Results and Vendor Response
- Shockpad Test Results
- Turf Test Results
Enhancement Program Documents:
- City Manager 9/18/24 Letter to Nursery Field Neighbors Re: Enhancements
- Nursery Neighbors Comments Re: Enhancement Program
- City Manager 7/24/24 Letter to Nursery Field Neighbors Re: Enhancements
Nursery Field Documents (thru 5/1/24):
- Approved Resolution for Turf at Nursey Field 5/1/2024
- NEW Proposed Resolution for Turf Field presented 4/17/24
- Resolution for Grass Fields 4/17/24) (Not passed)
- Field Fund Presentation (03/20/24)
- City Council 12/6/23 Resolution (including Neg Dec and Coastal Consistency Determination)
- Additional Information (12/5/23)
- Westchester Count Comments (11/28/23)
- City Planning Commission memo to City Council (11/21/23)
- City Consultant Letter Re PFAS (11/14/23)
Nursery Field Documents and Plans (10/20/23):
- Revised Nursery Field Plans (10/19/23)
- SHPO Review (10/20/23)
- Soil Boring Memo
- Planning Commission Submission for 10/24 Mgt.
Nursery Field Documents and Plans (9/23/23):
- Cover Letter
- EAF Parts 1 & 2
- EAF Narrative Attachment
- EAF Figures and Maps
- LWRP Application Forms
- Floodplain Management Forms
- Wetland Review Forms
- Nursery Field Plans
- Hydrologic Analysis
- SHPO Determination
- Project Area Photo Log
- Complete Submission for download (54 MB)
Consultant and Staff Presentations
- Nursery Field Presentation March 6 2024
- Ramboll Flood and Drainage (10/24/23 Planning Commission Mgt)
- Nursery Alternatives (10/24/23 Planning Commission Mgt)
- Ramboll Flood and Drainage (10/10/23 Planning Commission Mgt)
- Review Process (10/10/23 Planning Commission Mgt)
- Vison Sports Design (10/10/23 Planning Commission Mgt)
- GZA Presentation (10/10/23 Planning Commission Mgt)
Other Nursery Field Information
- Photos of Old Unrecyclable Turf
Atlantic article on turf Dec 2019
City of Rye - Army Corp Boat Basin FINAL Suitability determination_
Crumb_Rubber_Water Quality
Sea Level change and wetlands_1100-2-1
Sierra Club ltr to UMD re synthetic turf 11.4.2016.pdf
Wetlands Can Help Fight Climate Change - Scientific American
Wetlands Disappearing Three Times Faster than Forests UNFCCC
wetlands_and_climate_change_consideratons_for_wetland_program_managers_0715
wetlands-climate-change
York PA article unnrecylable turf
Residents may email comments to: nurseryfield@ryeny.gov