im_pact2.gif (4714 bytes)

Technical Study

Request for Proposals (RFP)

Table of Contents

HOME

PROJECT IMPACT TOP PAGE

TECHNICAL STUDY INFO

Top of RFP

Scroll Down As Needed

Download

Document In MS Word 7.0a

or View in MS Word Viewer


Scope of Services Contents

1.1 Purpose of Study

(top of contents)

1.2 Project Background & Setting

(top of contents)

1.3 Project Study Area

(top of contents)

1.3.1 Blind Brook Watershed

(top of contents)

1.3.1.1 Principal Flooding Problems

(top of contents)

1.3.1.2 Prior Flood Control Efforts

(top of contents)

1.3.1.3 Water Quality Considerations

(top of contents)

1.3.2 Beaver Swamp Brook

(top of contents)

1.3.2.1 Principal Flooding Problems

(top of contents)

1.3.2.2 Prior Flood Control Efforts

(top of contents)

1.3.2.3 Water Quality Considerations

(top of contents)

2.1 Literature Review

(top of contents)

2.2 Watershed GIS Database Development

(top of contents)

2.2.1 Benchmark Grid Survey

(top of contents)

2.2.2 Repetitive Property Loss Survey and Mapping

(top of contents)

2.2.3 Lowest Opening Survey (Habitable Structures)

(top of contents)

2.2.4 Lowest Member Survey (Bridges)

(top of contents)

2.2.5 SPDES Outfalls Survey and Mapping

(top of contents)

2.2.6 Wetland Survey and Mapping

(top of contents)

2.2.7 Model Input Data*

(top of contents)

2.3 Stormwater Modeling

(top of contents)

2.3.1 Hydrologic Modeling

(top of contents)

2.3.1.1 General Purpose

(top of contents)

2.3.1.2 Selection of Models

(top of contents)

2.3.1.3 GIS Compatibility

(top of contents)

2.3.1.4 Calibration of Models

(top of contents)

2.3.1.5 Anticipated Products

(top of contents)

2.3.2 Hydraulic Modeling

(top of contents)

2.3.2.1 General Purpose

(top of contents)

2.3.2.2 Anticipated Products

(top of contents)

2.3.3 Bowman Avenue Dam Study

(top of contents)

2.3.4 Hurricane Wind Simulation Modeling

(top of contents)

2.4 Watershed Plan Development

(top of contents)

3.1 General Requirements for the Scope of Services

(top of contents)

3.2 Required Deliverables

(top of contents)

3.3 Timing

(top of contents)

3.4 Content of Submissions

(top of contents)

3.5 Evaluation and Selection of Proposer

(top of contents)

3.6 Legal and Financial Requirements

(top of contents)

3.7 Responses

(top of contents)

Top of RFP